Leominster High School Addition/Renovation

Location

Leominster, Massachusetts

Area

296,000 square feet

Key Features

  • Originally opened in 1963, Leominster High School required a school-wide renovation
  • Upgrades included a new heating system, lighting, air conditioning, energy-saving windows, tile floors, ceilings and a new science laboratory wing
  • Using a Chapter 149A CM at Risk delivery method, the work was phased to allow the building to remain occupied during construction
  • Sustainability goals were achieved through Massachusetts Collaborative for High Performance Schools (MA-CHPS) accreditation

Key Contacts

Eric Moore
Eric D. Moore

Principal

AIA

Rob Para
Robert F. Para Jr.

Principal

AIA

Peter Caruso
Peter A. Caruso, Jr.

Associate Principal

AIA, LEED AP, NCARB

the hallway of the school before the renovationthe renovated hallway of the leominster high school showing new tile floors
the stairwell before the renovationstairwell from the vantage of the top of the stairs
renovated hallway with stairwell going up to the second floor of the school
renovated exterior of the school
renovated exterior of the leominster high school
renovated hallway showing new lighting and tiles
renovated auditorium space in Leominster High School

Key Contacts

Eric Moore
Eric D. Moore

Principal

AIA

Rob Para
Robert F. Para Jr.

Principal

AIA

Peter Caruso
Peter A. Caruso, Jr.

Associate Principal

AIA, LEED AP, NCARB