Key Features

  • Originally opened in 1963, the high school required a school-wide renovation
  • Upgrades included a new heating system, lighting, air conditioning, energy-saving windows, tile floors, ceilings and a new science laboratory wing
  • Using a Chapter 149A CM at Risk delivery method, the work was phased to allow the building to remain occupied during construction
  • Sustainability goals were achieved through Massachusetts Collaborative for High Performance Schools (MA-CHPS) accreditation