Leominster High School Addition/Renovation
Key Features
- Originally opened in 1963, Leominster High School required a school-wide renovation
- Upgrades included a new heating system, lighting, air conditioning, energy-saving windows, tile floors, ceilings and a new science laboratory wing
- Using a Chapter 149A CM at Risk delivery method, the work was phased to allow the building to remain occupied during construction
- Sustainability goals were achieved through Massachusetts Collaborative for High Performance Schools (MA-CHPS) accreditation