Clinton Middle School
- The Town of Clinton and the MSBA (Massachusetts School Building Authority) selected LPA|A to conduct a feasibility study for the town’s middle school, which originally opened in 1976.
- The study included consideration of two enrollment options: a 550-student school serving grades 5-8, or a 700-student school for grades 4-8. The District decided to move forward with the 700-student school option.
- Construction is anticipated to being in the summer of 2025 and open in late 2027.
- The project team has developed a website to keep the community informed about the project as it moves forward: www.clintonmiddleschoolbuildingproject.com